Menu

LED projector light

Payment
T/T
Minimum Order
-
Delivery
within 14 working days
Origin
shenzhen,China
Packing
-
Inspection
-
Remarks
1.Power supply must be connected with earth wire to avoid lighting strike 2.The electrical terminal must be wrapped up by electric tape cloth to avoid raining water flow into the inside of the lamp 3.Ensure the outlet and shelf of the lamp be at the sam
On ECPlaza since 2012
  • 4F,No.102 Industrial Bld,Xiaxue,Bantian,Shenzhen,China
    shenzhen, Guangdong
    China
  • 86-755-2846-4789
  • 86-755-2846-4789
user image
Marketing department, Sales Engineer
Louisa Cheng
Contact Now